Translate

2023年1月23日星期一

John Deere Engines Piston and Connecting Rod Installation Guide

 John Deere engines   piston  and   connecting rod installation Guide


NOTE: Pistons must be installed in the cylinder liner
from which they were removed.



1. Coat pistons and rings with clean engine oil. Install
pistons in liners, using JDE84 piston ring compressor.
NOTE: Make sure that “FRONT” mark (A) on the top of
each piston faces toward front end of cylinder
block.

JCB ServiceMaster 4 v22.9.3 [12.2022] Diagnostic Software Download and Installation



2. Push piston down until top ring is in liner.

 

 

   3. Install bearing inserts, making sure small tangs (B) on
each half of the inserts fit in recess of rod and cap.

2017 JCB Service Parts Pro+Service Repair Download

 
4. Install cap so that large slot in cap (C) fits large tang
(D) on connecting rod.


5. Dip NEW connecting rod cap screws in clean oil and
tighten them alternately to following torques:
IMPORTANT: NEVER use connecting rod cap screws
more than once.
• 3029, 4039 and 6059 engines:
Initially tighten cap screws to 56 N·m (40 lb-ft)
• 4045 and 6068 engines:
Initially tighten cap screws to 66 N·m (50 lb-ft)


6. Torque-turn all cap screws 90—100 degrees. (See
next module).
CD,3274,G10,16 -19-20FEB92




没有评论:

发表评论

How to relieve hydraulic pressure in the hydraulic circuit of a CAT excavator.

  How to relieve hydraulic pressure in the hydraulic circuit of 312D2 and 313D2 excavators   Steps to relieve pressure:   Caterpillar ET 202...