Translate
2024年6月23日星期日
Yanmar Engine Starting Motor Disassembly Introduce
For Yanmar Diesel Engine Agriculture Excavator Tractor Marine Generator Diagnostic tool
(1) Disassembling order
1) Nut M8 (Disconnect the connecting wire.) See the disassembly drawing.
2) Screw M4 (2)
3) Through bolt M5 (2)
4) Rear cover
5) Brush holder
6) Yoke assy.
7) Armature
8) Bolt M6 (2)
9) Magnetic switch
10) Dust cover
11) Shift lever
12) Screw M4 (3)
13) Bearing retainer
14) Gear case
15) Pinion stopper clip
16) Pinion stopper
17) Return spring
18) Pinion shaft
19) Clutch assy
(2) Disassembly procedure
1) Nut M8
Remove the magnetic switch nut M8 (12 mm),
and disconnect the connecting wire.
2) Screw M4 (2)
03.202 SA Direct 2.43 OfflineDiagnostic Software (The latest version)
3) Through bolt M5 (2)
4) Rear cover
Remove the M4 screw fastening the brush holder
and remove through bolt M5 for rear cover
removal.
5) Brush holder Pull the brush spring up with the brush spring puller. On the negative (-) side, bring the brush spring into contact with the side of the brush for
lifting from the commutator surface. On the positive (+) side, extract the brush from the brush holder.
6) Yoke Assy.
7) Armature Remove the brush holder. The armature and yoke assy can now be removed.
8) Bolt M6 (2)
9) Magnetic switch Remove bolt M6 (10 mm), and the magnetic switch can be removed.
10) Dust cover
11) Shift lever Take the dust cover out from the gear case. The shift lever can be removed
12) Screw M4 (3)
13) Bearing retainer
14) Gear case Remove screw M4, and the bearing retainer and clutch assy can be removed.
15) Pinion stopper clip Remove the bearing retainer at the edge and the bearing, and shift the pinion stopper toward the inion. use a plain screwdriver and pry to
remove the pinion stopper clip
16) Pinion stopper
17) Return spring
18) Pinion shaft
2018Y anmar Engine Diagnostic Service Tool Software
19) Clutch Assy Remove the pinion stopper clip. The pinion stopper, return spring, pinion shaft and bearing retainer can be removed. Disassembly is completed now
2024年6月18日星期二
How to Bleed the Air from the Brake Circuit of a Komatsu Forklift
This article explains how to bleed the air out of the brake circuit of a Komatsu forklift
New glass installed in JCB backhoe loader cabin
2017 JCB Service Parts Pro+Service Repair Download
1
Make sure the two spacer blocks are in position (see
step 1 of Preparing the New Glass).
2
Install the glass in the frame aperture:
a ALWAYS use the special lifting tools when moving
the glass. Use a lifting strap to hold large panes of
glass in position as shown W.
b Sit the bottom edge of the glass on the spacer
blocks as shown X.
c Make sure that the glass is correctly positioned, then
gently press around the edges of the glass and
ensure full adhesive contact is achieved. Do not
press too hard or too much adhesive will squeeze
out.
Section B
Body & Framework
9803/3280
Section B
21 - 5
Issue 1
Service Procedures
8-10mm
10-15mm
S186440
S189930
A186410
S
T
03.2024 JCB ServiceMaster4 v24.3.1 Diagnostic Software with SW Files
3
Make the inside seal smooth:
a Wearing surgical gloves, dip your finger in a soapy
water solution.
b
Use your finger to make the inside seal smooth.
4
All exposed edges must be sealed using Black
Polyurethane Sealant (see Sealing and Retaining
Compounds).
5
Clean the glass after installation:
IMPORTANT: Use extreme caution when wiping the inside
of the new glass - pushing too hard on the inside of the
glass will affect the integrity of the bonded seal.
a Small amounts of sealant can be cleaned from the
glass using the 'Active Wipe 205'.
b Large amounts of excess sealant should be left to
'cure' (see Note 4) and then cut off with a sharp
knife.
Note 4: On completion of the glass replacement procedures,
the sealant 'curing' time is 30 minutes. This means that the
machine can be driven and used after 30 minutes, but it
MUST NOT be used during the curing period of 30 minutes.
c
Clean the glass using a purpose made glass
cleaner.
6
On completion of the glass installation procedures tidy
the work area:
a Remove ALL broken glass from the cab area.
b Remove the protective covers from the cab seat and
control pedestals.
c Renew all 'warning' and 'information' de
JCB Agco SISU Power WinEEM4-JCB Service Tool 2.8.0
2024年6月17日星期一
JCB Backhoe Loader Air Conditioning Compressor Drive Belt - Adjusting
JCB Heavy Duty Truck Diagnostic Tool JCB Electronic Service Tool with JCB ServiceMaster42023.09
1 Park the machine on firm level ground. Raise and block the loader arms. Lower the backhoe to the ground and
stop the engine.
2 Remove the starter key.
! WARNING
Make sure the engine cannot be started. Disconnect thebattery before doing this job.
3 Raise the Bonnet
4 Remove both Side Panels
5 Loosen pivot fastening bolt A. Loosen adjustment link fastening bolts B and C.
6 Position the compressor so that there is approximately 10 mm (3/8 in) slack at point X midway along the belt.
7 Tighten bolts A, B and C. Make sure that bolt A is the last to be tightened. Note: If a new belt is fitted, check the belt tension after the first 20 hours of op
03.2024 JCB ServiceMaster4 v24.3.1 Diagnostic Software with SW Files
How to relieve hydraulic pressure in the hydraulic circuit of a CAT excavator.
How to relieve hydraulic pressure in the hydraulic circuit of 312D2 and 313D2 excavators Steps to relieve pressure: Caterpillar ET 202...
-
This article introduces the Perkins 2806F-E18TA industrial engine diesel DEF injector disassembly instructions 2023A& 2022A Perkins EST ...
-
This article introduces the Perkins 2806F engine relay (ARD nozzle heater) removal instructions 2023A& 2022A Perkins EST Electronic Serv...
-
This article introduces the Perkins 2806F engine exhaust manifold removal procedure 2023A& 2022A Perkins EST Electronic Service Tool Di...